1. Introduction
    1. Name: Vural
    2. Greeting: Nice to meet you, Mr. Orhan
  2. Background
    1. Language Proficiency: Limited use of English for 6 years
    2. Location: Ereğli/Zonguldak
    3. Age: 32 years old
    4. Current Role: Manufacturing Engineer (5 years)
  3. Experience
    1. Fields of Expertise:
      1. Procurement
      2. Planning
      3. Cost Analysis
      4. Production Management
    2. Resume Submission:
      1. Detailed chronological experiences in CV
    3. Summary
      1. Work Experience Summary
        1. Responsibilities:
          1. Alcos
          2. Yukon
        2. Line Setup Experience:
          1. Willing to discuss
  4. Career Journey
    1. Initial Phase:
      1. Started with fieldwork
      2. Involved in procurement processes
    2. Transition:
      1. Moved to ONAT company, Istanbul
      2. Roles:
        1. Analysis and Design Engineer
        2. Procurement and Planning Engineer (return to Alcos)
    3. Alcos Closure:
      1. Joined YUKON as a Production Manager
    4. Entrepreneurial Venture:
      1. Current involvement in material procurement, sales, transportation, and engineering services
  5. Specific Projects
    1. At Alcos:
      1. Manufacturing of cutting, slicing, and packaging lines
      2. Projects involved: Kloeckner Metal Inc., Papalotes
      3. Roles:
        1. Project and assembly of hydraulic-pneumatic lines
        2. Valve-blocks and tubing works
        3. Staff management
        4. Labor and material cost analysis
    2. Technical Skills:
      1. Tool selection
      2. Control work in machining processes (turning, boring, CNC milling)
      3. Considerations: Rotation, Feed rate, Chip depth, Material properties
  6. Role at YUKON
    1. Tasks:
      1. Worked on cutting and slicing line at İSDEMİR
      2. Technical task division among machining, welding, and assembly teams
      3. Production process supervision
      4. External firm oversight during outsourced production
    2. Focus:
      1. Ensuring machine manufacturing alignment with project
  7. Line Installation Considerations
    1. Key Factors:
      1. Ground conditions
      2. Electrical-electronic elements
      3. Software aspects
      4. Tubing of hydraulic and pneumatic lines
      5. Placement of connecting elements
      6. System compliance with schematics
    2. Approach:
      1. Based on knowledge and experience
      2. Adherence to project plans and safety regulations